Fuji Electric Sdn Bhd | High-Capacity Split Casing Pump Supply

Manufacturing · TTE Engineering Sdn Bhd · Hi-Tech Park Kulim, Kedah

fuji electric building
Manufacturing Project

Fuji Electric Sdn Bhd | High-Capacity Split Casing Pump Supply

Project Overview

Client

TTE Engineering Sdn Bhd

Location

Hi-Tech Park Kulim, Kedah

Completed

2023

To supply and commissioning of industrial-grade Ebara horizontal split casing pumps for TTE Engineering Sdn Bhd, deployed at the Fuji Electric semiconductor manufacturing facility in Kulim, Kedah. The system features dedicated high-flow units precisely optimized for critical Chilled Water (CHWP) and Condenser Water (CDWP) facility loops.

The Challenge

Semiconductor fabrication plants operate under extreme thermal loads 24/7 due to heavy manufacturing equipment and stringent cleanroom climate control parameters. Any sudden fluctuation in temperature or a drop in utility fluid velocity can compromise delicate silicon wafer processing, leading to expensive batch failures and production downtime. The facility required a robust mechanical infrastructure capable of moving massive volumes of water continuously while minimizing energy consumption and allowing for swift, non-disruptive routine maintenance.

The Solution

To secure maximum thermal management efficiency and system reliability, heavy-duty Ebara Horizontal Split Casing Pumps were integrated into the factory's central cooling infrastructure:

  • Condenser Water Pump (CDWP) Loop: Driven by the heavy-duty 300 x 250 CNGC 90 model. Paired with a 90kW IE3 motor spinning a 340mm impeller, this unit achieves 82.8% efficiency to deliver a massive capacity of 11,670 L/min at 30m head to swiftly dissipate core facility heat.
  • Chilled Water Pump (CHWP) Loop: Managed by the high-volume 300 x 250 CNEC 37 model. Powered by a 37kW IE3 motor with a 274mm impeller, it runs at 81.0% efficiency to maintain an uninterrupted cold fluid supply line at 10,080 L/min at 15m head.

The horizontal split casing architecture of both models provides a major maintenance advantage: the top half of the casing can be removed to service rotating elements without disconnecting any underlying piping networks, drastically reducing potential factory downtime.